FAA Information Effective: Apr 17, 2025
All information is provided from the FAA unless otherwise noted.
Unattended
Designator: | 09 | 27 |
Elevation: | 1,374.3 ft | 1,370 ft |
Heading: | 094° true | 274° true |
Gradient: | 0.11% down | 0.11% up |
Traffic Pattern: | Left Pattern | Left Pattern |
Markings: | non-precision, in Good condition | non-precision, in Good condition |
Approach Lighting: |
|
|
Displaced Threshold: | n/a | n/a |
ILS/LOC: | n/a | n/a |
Obstructions: | n/a | n/a |
Comments: | n/a | n/a |
Designator: | 14 | 32 |
Elevation: | 1,376 ft | 1,370.3 ft |
Heading: | 139° true | 319° true |
Gradient: | 0.28% down | 0.28% up |
Traffic Pattern: | Left Pattern | Left Pattern |
Markings: | basic, in Good condition | basic, in Good condition |
Approach Lighting: | n/a | n/a |
Displaced Threshold: | n/a | n/a |
ILS/LOC: | n/a | n/a |
Obstructions: | n/a | n/a |
Comments: | n/a | n/a |
Number: | Start Date: (UTC) | End Date: (UTC) | Condition: |
---|---|---|---|
5/3587 | 04/30/2025 1427 | 05/30/2025 1427 | IAP EVELETH/VIRGINIA MUNI, EVELETH, MN.
VOR-A, AMDT 2B...
ALTERNATE MINIMUMS NA EXCEPT FOR ACFT EQUIPPED WIT… Show more |
4/2990 | 06/04/2024 1616 | IAP EVELETH/VIRGINIA MUNI, EVELETH, MN.
VOR-A, AMDT 2B...
PROCEDURE NA.
HIB VOR RESTRICTED.
2406041616-26060… Show more | |
Type: | Frequency / Phone: | Sector / Comments: | Call Sign: |
---|---|---|---|
Approach/Departure | 125.45 | Duluth | |
AWOS-3 | 118.825T (218) 744-2369 | ||
Clearance Delivery Phone | (218) 740-5950 | Duluth Approach | |
CTAF | 122.7 | ||
UNICOM | 122.7 |